the trend f’ing continues.
Sunday, July 29th, 2007 more floor.
2 coats of varathane water-borne polyurethane with hardener, 1 wet coat without hardener, in the dining room and living room. it started pouring rain and the temp dropped to 62f (16c) in a matter of minutes… raising the tack level of the polyurethane quite a bit…. resulting in some impurities in the last coat. being a non-hardened coat, it’ll all buff out. needs to be buffed before the layer of acrylic wax goes on in a few weeks, anyway. in another 4 hours, the floors can safely be walked on (barefoot or with socks). 4 more and i can move some of the furniture inside (on cotton pads), because i gotta go back to LA tomorrow… don’t think that leaving our sofas on the porch is the greatest of ideas.
dining room, still (very) wet:
![]()
living room, 5 minutes after the last application:
![]()
cool pocket doors between the living room and dining room:
![]()
the front bedroom just has one coat of un-hardened polyurethane, for now. not entirely happy with the outcome of the sanding, particularly the part along one wall that rebecca is giving me a hard time about ![]()
i’ll feather/blend it in better, sometime later… then put 2 more coats of poly.
the hall still needs to be stripped and blended into the front bedroom, and the back bedroom…… damn that room.
the back bedroom still has linoleum on it. it’s likely staying for a bit. i figure it’ll take roughly 20 hours to remove it, another 4 hours of sanding to level it… then stain and poly. for now, just plain don’t have the time before leaving.
soon, we’ll have to decide if the back bedroom’s floors will be done before moving everything into it… or later, after the bedrooms upstairs are done. i’m a bit torn between the two, as the linoleum is clean (save for a 1 square foot area i removed)… and it would be nice to actually use it as a bedroom. or, on the other hand, it would be nice to finish the floor and be done now.

